Cleaning and dredging works will be carried out at 26 new critical points of the Rímac River.

게시됨 2025년 11월 21일

원본 콘텐츠

The Ministry of Agrarian Development and Irrigation (Midagri) announced the start of a new phase of preventive intervention for cleaning and desilting in the Rímac River basin, in the Lima region. This stage includes the attention of 26 new critical points and the removal of sediments over 40.51 kilometers. The work will be carried out progressively until April 2026. The intervention will directly benefit more than 57,000 inhabitants of Santa Eulalia, Chaclacayo, Lurigancho–Chosica, San Juan de Lurigancho, El Agustino, Ricardo Palma, San Bartolomé, Matucana, and San Mateo de Otao, localities that face risks of overflows and floods every rainy season. The entity highlighted that this new stage begins after completing the cleaning and desilting work on 45 kilometers of the riverbed, an intervention that covered 56 critical points, achieving the goal a month and a half ahead of schedule, equivalent to the removal of more than 200 Olympic swimming pools of accumulated material. "The ...
출처: AgroPeru

더 깊이 있는 인사이트가 필요하신가요?

귀사의 비즈니스에 맞춤화된 상세한 시장 분석 정보를 받아보세요.
'쿠키 허용'을 클릭하면 통계 및 개인 선호도 산출을 위한 쿠키 제공에 동의하게 됩니다. 개인정보 보호정책에서 쿠키에 대한 자세한 내용을 확인할 수 있습니다.
'쿠키 허용'을 클릭하면 통계 및 개인 선호도 산출을 위한 쿠키 제공에 동의하게 됩니다. 개인정보 보호정책에서 쿠키에 대한 자세한 내용을 확인할 수 있습니다.